The Red Raven Assets
Resource Optimisation
Available for Enquiries
Get in Touch
Logistics control room with route maps and live delivery screens

Case studies

Helping a global logistics firm save £5M

The Red Raven Assets cut fuel use by 25%, pushed on-time deliveries to 99%, and paid back the work in 18 months. Clean numbers. Real change.

25%
Fuel reduction
99%
On-time delivery rate
18 months
Payback period

Impact in action

What we fixed

Short briefs. Hard results. Some projects needed route changes, some needed asset control, and one needed better visibility by the hour.

Route control

We cut empty miles, tightened load planning, and cleared the worst handoffs. Simple. The fleet moved less and achieved more.

Result

Fuel spend dropped by 25% across the first operating window.

Cost pressure

We found the biggest loss points in routing, idle time, and late dispatch. Then we fixed them in order.

Live visibility

Managers got a clearer read on where capacity was lost and where it was needed next.

Inventory rhythm

Stock checks were moved onto a tighter cadence, which cut avoidable rush movements.

On-time work

99% of deliveries landed on schedule after the new planning rules were live.

More success stories

Pick a sector

These filters are here to keep the page useful. Manufacturing, logistics, energy, and healthcare all run into different waste points, so the stories stay separate.

Factory shift plan

Manufacturing

-18%

The plant had too much overtime and too many stoppages at changeover. We reworked shift sequencing and machine allocation.

Key result

Output rose without adding another night shift.

Depot pacing

Logistics

+14%

Loading bays were running late in small pockets across the day. We balanced the schedule and reduced queue build-up.

Key result

Vehicles cleared faster and the depot stopped backing up.

Energy draw

Energy

-11%

Peak demand was costing too much. We timed non-urgent activity to avoid the highest draw windows.

Key result

The monthly bill dropped without any equipment change.

Clinic flow

Healthcare

-22%

A busy service needed better use of rooms, staff time, and supplies. We removed repeat checks and cut waiting time.

Key result

Staff spent more time on patients, less time on repeat admin.

Client quote

They fixed the waste fast.

"Why did we choose The Red Raven Assets? Because they found the waste in the first review and gave us a plan we could use straight away."

Semsi Lafrid
Operations Director, Northgate Freight

What the board saw

  • A clear cost line, not a guess.
  • Delivery targets held at 99%.
  • Payback landed in 18 months.

Partnered with

Names that trust the numbers

These are placeholder marks for client logos. They are kept quiet by default and colour up on hover, so the row stays calm on the page.

Northgate
Crescent Rail
Meridian Health
Westpoint Energy
Bramley Foods
Atlas Moves

Speak with us

If your operation is carrying avoidable cost, send the details. We read them closely.

Address

119 Westcott Crescent, London, Brent, W7 1PH, GB


Response window

Mon to Fri, 08:30 to 17:30.

We use cookies to enhance your browsing experience. By continuing to use this site, you agree to our use of cookies.